Torta Zanahoria — Grande
2,600
Rendimiento (gr)
$120,159
Costo Calculado (lote)
0.5 hr
Hrs Servicios
1.2 hr
Hrs Mano de Obra

Ingrediente Cant Und Valor Unitario Gr. Prod. Valor Total Fuente Acciones
Masa de Zanahoria
Masa de Zanahoria
1650 gr $112,101 5434 $34,039
Betun de Queso y Chocolate Blanco
Betun de Queso y Chocolate Blanco
180 gr $43,601 1000 $7,848
Ganache Chocolate Blanco
Ganache Chocolate Blanco
700 gr $209,000 4000 $36,575
Arequipe 20 gr $110,000 5000 $440
Almendra 50 gr $13,000 150 $4,333
Materia Prima (live): $83,235 Agregar

MO Overhead — tiempo de máquinas, setup, limpieza ($11,000/hr)
hr × $11,000 = $13,200
MO Directa (labor empleados) — salario real × horas en el lote
Asignar empleado

hr
× $11,000/hr = $5,500

Concepto Costo Acciones
Blonda mdf 26 cm $4,500
Caja 1 lb alta $4,500
Sticker grande $900
$
Desglose de Costos
Materia Prima $83,235
+ Merma (10.0%) $8,324
Servicios $5,500
MO Overhead $13,200
Blonda mdf 26 cm $4,500
Caja 1 lb alta $4,500
Sticker grande $900
COSTO CALCULADO $120,159
Costos Fijos (÷ 1,000 u/mes)
Alquiler cocina $900
Servicios (luz/agua) $280
Gas natural $130
Empaques y cajas $200
Internet $80
Total / unidad $1,590